Blog Header

Resources

The blog subtitle

CAN trials new cornice access system

Greater London House – Redecorations

CAN was approached to look at means of carrying out re-decoration of the facades of the building.  This former Carreras cigarette factory...

Hungerford Bridge bespoke access provision

Hungerford Bridge – Cast Iron Pier Repairs

Having identified that stitch repairs were required to the cast iron piers to Hungerford Bridge, Network Rail required the development of...

Samphire Hoe close call - bomb found!

Samphire Hoe close call – bomb found!

CAN is currently installing catch fences at the toe of the cliffs adjacent to the railway line. During works on site at...

Hagley Railway Cutting - Rock Face Stabilisation

Hagley Railway Cutting – Rock Face Stabilisation

The rock face of this narrow rail cutting required extensive stabilisation including de-vegetation, scaling and strengthening works to be carried out. The face...

Marple Aqueduct maintenance

CAN makes a TV appearance for Marple Aqueduct project

The Grade 1 Listed Marple Aqueduct is undergoing a programme of maintenance following receipt of National Lottery funding. The Grade 1 listed...

Hungerford Bridge bespoke access provision

Hungerford Bridge bespoke access provision

CAN is working with Costain & Network Rail providing a bespoke access system CAN is working with Costain & Network Rail, providing a bespoke...

Boston Boatyard Development - Quarry Face Stabilisation

Boston Boatyard Development – Quarry Face Stabilisation

With the walls of this old quarry forming the backdrop to what will be the back gardens of a new housing...

Lyme Regis – Coastal Slope Stabilisation

Lyme Regis – Coastal Slope Stabilisation

The project asked for the coastal slope stabilisation of a 900m long slope below which a new sea wall was being...

2014

Winter storms cause the catastrophic failure of the seawall and adjacent seacliff at Dawlish resulting in the closure of the main...

Jersey - Rock Anchoring and Cliff Stabilisation

Jersey – Rock Anchoring and Cliff Stabilisation

CAN acted as Principal Contractor on this major project to stabilise an old quarry prior to redevelopment and the adjacent unstable cliffs...