Blog Header

Resources

The blog subtitle

Bespoke access and containment system on Hungerford Bridge, London

Hungerford Bridge bespoke access provision

CAN is working with Costain & Network Rail providing a bespoke access system CAN is working with Costain & Network Rail, providing a bespoke...

Quarry Face Stabilisation - Boston Boatyard Development

Quarry Face Stabilisation – Boston Boatyard Development

With the walls of this old quarry forming the backdrop to what will be the back gardens of a new housing...

Lyme Regis – Coastal Slope Stabilisation

Lyme Regis – Coastal Slope Stabilisation

The project asked for the coastal slope stabilisation of a 900m long slope below which a new sea wall was being...

2014

Winter storms cause the catastrophic failure of the seawall and adjacent seacliff at Dawlish resulting in the closure of the main...

Rock Anchoring and Cliff Stabilisation - Jersey

Rock Anchoring and Cliff Stabilisation – Jersey

CAN acted as Principal Contractor on this major project to stabilise an old quarry prior to redevelopment and the adjacent unstable cliffs...

2013

CAN acts as Principal Contractor for the design and build stabilisation of Westmount Quarry and Park Heights, in Jersey. The £6m+...

Rock Bolting & Tecco Netting Installation - West Cornforth

Rock Bolting & Tecco Netting Installation – West Cornforth

Fracturing of the rock faces at either side of the A1(M) cutting in West Cornforth required remediation to safeguard the adjacent...

Beaminster Tunnel Stabilisation

Beaminster Tunnel Stabilisation

Soil slipped from an unstable slope above Beaminster tunnel portal in July 2012, tragically killing two people.  The client was under...

Coldrenick Viaduct – Pier Strengthening

Coldrenick Viaduct – Pier Strengthening

The project required the removal of 38 defective existing steel collars, comprising heavy section steel channels and tie bars.  As each...

Milverton Railway Viaduct – Masonry Repairs

CAN was invited to carry out repairs to a masonry railway viaduct running over a watercourse. The works required consisted of; inspection,...