CAN was contracted to carry out extensive redecorating works to the Teddington Footbridge in West London.

The works included shot blasting of the existing lead based paint system and the reapplication of a new coating system.

A bespoke access system was developed to incapsulate the work area allowing for continued pedestrian use and to prevent pollution of the river Thames.

The project was completed within the agreed time frame with limited disruption to the pedestrian and river traffic.

Duration:       4 Months

Client:            FM Conway

Location:       Teddington, West London