Risehill – Tunnel Shaft Works
- 04/12/2017 /
- Case Studies
Located on open exposed moorland on the edge of the Yorkshire Dales, this was for CAN Structures a remote project. ...

Brook Green – Sealant Installation
- 06/01/2017 /
- Case Studies
The Brook Green sealant installation project involved complete refurbishment of an old car showroom and conversion into office space with the...

Holmes Chapel – Viaduct Brickwork Repairs
- 06/01/2017 /
- Case Studies
This 23 span viaduct carries the Crewe – Stockport railway line over the River Dane. It was constructed with brick...

Trawsfynydd Power Station – Reactor Hall Repairs
- 17/03/2016 /
- Case Studies
As part of the decommissioning programme of this now offline 1950s nuclear power station the external fabric of the structure required...

Eliot & Wentworth Court – Inspection and Repair
- 11/02/2016 /
- Case Studies
Following extensive water ingress issues to a recently built residential block CAN was asked to undertake an inspection of facia cladding...

Milverton Railway Viaduct – Masonry Repairs
- 17/11/2012 /
- Case Studies
CAN was invited to carry out repairs to a masonry railway viaduct running over a watercourse. The works required consisted of; inspection,...