Blog Header

Structural Maintenance

Case Studies

Glasgow High Rise Blocks – Multi Storey Flat Inspections

CAN Structures Ltd was awarded a 3-year contract by The Wheatley Group to undertake inspections on 136no. high rise structures across...

No.1 London Bridge Soffit Inspection and Repair

The inspection and repair of the cladding system to the soffit of an iconic building in central London following the failure...

Falling Sands Viaduct – Bridge Repairs

Falling Sands Viaduct was built in the 1870s and forms part of the Bridgnorth to Bewdley section of the Severn Valley...

Glass roof cassettes

Stadium Glass Cassette Installation– Tottenham Hotspur Stadium

In 2018 CAN were requested to undertake the installation of 270 glass roof cassettes and associated gaskets to the new...

Roof metal cassette

Stadium Roof Metal Cassette Installation– Tottenham Hotspur Stadium

In 2018 CAN were requested to undertake the installation of 810, 14m x 2m roof metal cassettes, each weighing approximately...

Enterprise House – Building Façade Refurbishment

CAN undertook the refurbishment of a building façade adjacent to the operational railway and associated overhead line electrification, requiring window removal...

Riverside Stand – Fulham FC Soffit Cladding Installation

To overcome program restrictions Buckingham Group asked CAN to design a bespoke access methodology for works to the soffit of the...

Northpoint – ACM Cladding Removal

Northpoint residents were being charged for an ongoing fire watch service because of the combustible nature of the cladding material installed...

Somerton House – Window Replacement

CAN was requested to assist with the window replacement scheme to Somerton House and particularly to provide access to and encapsulation...

QE2 Bridge Cable Stay Recoating

The Queen Elizabeth II Bridge is on the M25 at Dartford. The cables on the bridge are up to 220m long...