Blog Header

Structural Maintenance

Case Studies

Phase 1 Enfield Blocks – Building Safety Case

CAN was contracted to undertake external building safety inspections across 19 blocks in Enfield, North London. Using rope access techniques, CAN...

Richmond Rail Bridge – Brickwork Repairs and De-vegetation

CAN was requested to undertake brickwork repairs and de-vegetation works to the Richmond Rail Bridge. The vegetation was to be removed...

Concrete Inspection & Repairs – EVT Grain JV – CAP 25 Storage Tank

CAN Structures was instructed to undertake an inspection of the 290 linear metre internal concrete wall to the CAP 25 Storage...

Principle Bridge Inspection, Tyne Bridge

CAN was contracted to undertake a thorough principal inspection & assessment of the Tyne Bridge in accordance with CS 450 Inspection...

Thames Court River Wall- Pointing Repairs

CAN was instructed by CBRE to conduct repairs to the Thames Court river wall in Central London. The project consisted of...

Arthur Wait Stand, Crystal Palace FC – Laser Display Screen

CAN was contracted to remove the advertisement banners and vertical facias, renovate existing steelwork and install laser display screens across the...

Blackfriars Railway Bridge – Inspection

CAN was requested to undertake an inspection of the Blackfriars Railway Bridge. Site constraints included working over water and on the...

Wheatley Group – Net Installation

Following the failure of the render to the elevations of two high rise blocks, Wheatly Group requested CAN Structures Ltd design...

Golden Jubilee Access

Golden Jubilee Footbridge – Principle Inspection

CAN was requested to undertake a principle inspection to the iconic Golden Jubilee Footbridges in London. The inspections included all cables,...

Salt Quay House – Net Installation

CAN Structures Ltd was requested to design and install an encapsulation system to protect pedestrians from failed limestone facia panels to...