Northfleet Staircase – Redecoration Works
- 09/08/2018 /
- Case Studies
In 2017 CAN was requested to undertake the redecoration of all corroded steelwork to the access staircase to the Bulk Storage...

Old Trafford Football Stadium – Cladding & Steelwork Repairs
- 18/01/2018 /
- Access
As part of the ongoing maintenance plan to the South Stand at Old Trafford, the home of Manchester United Football Club,...

Rhyl Bridge (Pont-y-Ddraig) – Minor Bridge Maintenance
- 24/10/2017 /
- Case Studies
Ongoing general maintenance was required to the bridge, consisting of the installation of new electrical feed cables to the under-bridge lights...

Millennium Footbridge – Redecoration works
- 19/10/2015 /
- Case Studies
The iconic Central London Millennium footbridge over the River Thames was in need of its paint system renewing. The major problem...

Greater London House – Redecorations
- 17/07/2015 /
- Access
CAN was approached to look at means of carrying out re-decoration of the facades of the building. This former Carreras cigarette factory...

Coldrenick Viaduct – Pier Strengthening
- 17/04/2013 /
- Case Studies
The pier strengthening project required the removal of 38 defective existing steel collars, comprising heavy section steel channels and tie bars. ...