Blog Header

Structural Maintenance

Case Studies

Northfleet Staircase - redecoration works using a lightweight suspended access cradle

Northfleet Staircase – Redecoration Works

In 2017 CAN was requested to undertake the redecoration of all corroded steelwork to the access staircase to the Bulk Storage...

Manchester United Old Trafford Football Stadium - cladding & steelwork repairs

Old Trafford Football Stadium – Cladding & Steelwork Repairs

As part of the ongoing maintenance plan to the South Stand at Old Trafford, the home of Manchester United Football Club,...

Rhyl Bridge (Pont-y-Ddraig) - Minor Bridge Maintenance. Getting to the underside of the bridge deck.

Rhyl Bridge (Pont-y-Ddraig) – Minor Bridge Maintenance

Ongoing general maintenance was required to the bridge, consisting of the installation of new electrical feed cables to the under-bridge lights...

Painting of the Millennium Footbridge

Millennium Footbridge – Redecoration works

The iconic Central London Millennium footbridge over the River Thames was in need of its paint system renewing.  The major problem...

CAN trials new cornice access system

Greater London House – Redecorations

CAN was approached to look at means of carrying out re-decoration of the facades of the building.  This former Carreras cigarette factory...

Coldrenick Viaduct – Pier Strengthening

Coldrenick Viaduct – Pier Strengthening

The pier strengthening project required the removal of 38 defective existing steel collars, comprising heavy section steel channels and tie bars. ...