CAN was contracted with the cleaning, preparation and recoating to the front façade of SELCHP, an energy from waste plant.

Using industrial rope access techniques, CAN Operatives mechanically removed loose and flaking paint and degreased the surface in preparation for recoating to the front facade of the boiler house.

Spanning 573 sqm, the façade was further recoated using a Girocote primer and cladding paint system.

The boiler house remained operational for the duration of the works and was completed on schedule to the client’s satisfaction.

Duration:       3 weeks

Client:            Veolia

Location:       SELCHP Boiler House