
Shute Shelve Tunnel – De-vegetation & Rock Bolting
- 29/11/2017 /
- Case Studies
Shute shelve tunnel is an old disused railway tunnel is now used exclusively by pedestrians and cyclists. Areas of unstable...

Thirlmere – Rock Bolting & Netting
- 12/10/2017 /
- Case Studies
CAN undertook a design and build contract to stabilise this section of rock face on the A591 near Thirlmere, installing an...

Woodside Retail Park – Quarry Face Stabilisation
- 03/08/2017 /
- Case Studies
This old disused quarry is home to a small retail park, Woodside retail park. Following a fire to one of the...

Hagley Railway Cutting – Rock Face Stabilisation
- 22/02/2015 /
- Case Studies
The rock face of this narrow rail cutting required extensive stabilisation including de-vegetation, scaling and strengthening works to be carried out. The face...

Boston Boatyard Development – Quarry Face Stabilisation
- 17/10/2014 /
- Case Studies
With the walls of this old quarry forming the backdrop to what will be the back gardens of a new housing...

Jersey – Rock Anchoring and Cliff Stabilisation
- 17/03/2014 /
- Case Studies
CAN acted as Principal Contractor on this major project to stabilise an old quarry prior to redevelopment and the adjacent unstable cliffs...

West Cornforth – Rock Bolting & Tecco Netting Installation
- 17/07/2013 /
- Case Studies
Fracturing of the rock faces at either side of the A1(M) cutting in West Cornforth required remediation to safeguard the adjacent...

Glandyfi – Rock Anchoring in New Highways Cuttings
- 17/10/2011 /
- Case Studies
The stabilisation of two new highways cuttings as part of a substantial trunk road widening scheme. The Glandyfi site is restricted on...