Woodlands Avenue Mudslide – Slope Stabilisation
- 15/11/2018 /
- Case Studies
During a period of prolonged stormy weather, the mainline railway between Penzance to Dawlish was completely closed as a result...

Ashley Hill South Embankment – Earthworks Projects
- 14/11/2018 /
- Case Studies
The Filton Bank 4 Track project increases the number of tracks from 2 to 4 between Dr Days and Filton...

Eden Brow – Inclined Drains
- 12/11/2018 /
- Case Studies
Following a landslide which destroyed part of the Settle to Carlisle railway line, a large project was undertaken to rebuild the...

Loch Katrine – Slope Stabilisation Works
- 03/10/2018 /
- Case Studies
Loch Katrine is the main raw water source for the north of Glasgow, located within the Ben A’an and Brenachoile...

Tarmac, Bulk Facility Storage Facility – Metal Staircase Redecoration
- 09/08/2018 /
- Case Studies
In 2017, CAN was requested to undertake the redecoration of the steelwork to the access staircase to the Bulk Storage Facility...

Union Chain Bridge – Structural Inspection & Testing
- 01/08/2018 /
- Case Studies
Northumberland County Council wished to support a funding request, to the National Lottery, for the refurbishment of the Grade 1 listed...

Waterloo Bridge – Pier Head Access Upgrade Works
- 31/07/2018 /
- Access
As part of a refurbishment project to improve the access routes onto the pier heads CAN was asked to install...

Cromer Pier – Steelwork Inspection
- 30/07/2018 /
- Case Studies
The 150 metre long steel structure of Cromer Pier is located on the Norfolk coast. Stood in a marine environment,...

Nottingham Castle – Geotechnical Inspection
- 25/05/2018 /
- Case Studies
Nottingham City Council called CAN in after a rock fall, to undertake an inspection of the cliff face around Nottingham...

Bridgnorth – Deveg & Catch Fencing
- 17/05/2018 /
- Case Studies
The house is located on the A442 and is set into the base of the cliff. The tree covered slope above...