Roof metal cassette

Stadium Roof Metal Cassette Installation– Tottenham Hotspur Stadium

In 2018 CAN were requested to undertake the installation of 810, 14m x 2m roof metal cassettes, each weighing approximately...

Enterprise House – Building Façade Refurbishment

CAN undertook the refurbishment of a building façade adjacent to the operational railway and associated overhead line electrification, requiring window removal...

Taffs Well Quarry ‐ Quarry Rock Face Stabilisation

CAN undertook the installation of rock face stabilisation and containment measures to the quarry walls adjacent to and above the access...

Riverside Stand – Fulham FC Soffit Cladding Installation

To overcome program restrictions Buckingham Group asked CAN to design a bespoke access methodology for works to the soffit of the...

Northpoint – ACM Cladding Removal

Northpoint residents were being charged for an ongoing fire watch service because of the combustible nature of the cladding material installed...

Somerton House – Window Replacement

CAN was requested to assist with the window replacement scheme to Somerton House and particularly to provide access to and encapsulation...

QE2 Bridge Cable Stay Recoating

The Queen Elizabeth II Bridge is on the M25 at Dartford. The cables on the bridge are up to 220m long...

Corby Bridge (Wetheral Viaduct) Refurbishment of Pedestrian Walkway

CAN were appointed to undertake the refurbishment of a high level pedestrian walkway (dating from 1851) over the River Eden in...

Dover Docks – Pier F Installation of Mooring Equipment

CAN were contracted to assist with the installation of mooring equipment to Pier F, Port of Dover, particularly to access the...

Vale of Glamorgan Line – Rock Netting & Catch fences

This steep sided railway cutting on the Vale of Glamorgan line in South Wales had a history of instability, with weathering...