
Loch Katrine – Slope Stabilisation Works
- 03/10/2018 /
- Case Studies
Loch Katrine is the main raw water source for the north of Glasgow, located within the Ben A’an and Brenachoile...

Tarmac, Bulk Facility Storage Facility – Metal Staircase Redecoration
- 09/08/2018 /
- Case Studies
In 2017, CAN was requested to undertake the redecoration of the steelwork to the access staircase to the Bulk Storage Facility...

Union Chain Bridge – Structural Inspection & Testing
- 01/08/2018 /
- Case Studies
Northumberland County Council wished to support a funding request, to the National Lottery, for the refurbishment of the Grade 1 listed...

Waterloo Bridge – Pier Head Access Upgrade Works
- 31/07/2018 /
- Access
As part of a refurbishment project to improve the access routes onto the pier heads CAN was asked to install...

Cromer Pier – Steelwork Inspection
- 30/07/2018 /
- Case Studies
The 150 metre long steel structure of Cromer Pier is located on the Norfolk coast. Stood in a marine environment,...

Nottingham Castle – Geotechnical Inspection
- 25/05/2018 /
- Case Studies
Nottingham City Council called CAN in after a rock fall, to undertake an inspection of the cliff face around Nottingham...

Bridgnorth – Deveg & Catch Fencing
- 17/05/2018 /
- Case Studies
The house is located on the A442 and is set into the base of the cliff. The tree covered slope above...

Wembley Depot – Soil Nailing
- 17/05/2018 /
- Case Studies
Chilterns Railway depot has been cut into a face made up of London Clay – this was originally retained by short,...

Gibraltar Eastside Catch Fencing Phase 1B
- 08/05/2018 /
- Case Studies
CAN Geotechnical returned to Gibraltar to extend the 5000kJ catch fencing we had previously installed in 2017. Working closely with...

Todmorden – Soil Nailing & Facing
- 15/03/2018 /
- Case Studies
Todmorden is an area that’s sustained a long history of problems associated with flooding events. Lying at the bottom of a...