Ardley, Energy from Waste - High Level Deluge System Installation

Ardley, Energy from Waste – High Level Deluge System Installation

CAN was asked to undertake the installation of the high level deluge, smoke detection and lighting systems on this large new...

Glandyfi - Rock Anchoring in New Highways Cuttings

Glandyfi – Rock Anchoring in New Highways Cuttings

The stabilisation of two new highways cuttings as part of a substantial trunk road widening scheme.  The Glandyfi site is restricted on...

Bridge Vally Road Slope Stabilisation

Bridge Valley Road – Stabilisation Works

Bridge Valley Road forms an important commuter link between Clifton and Bristol centre, situated on the side of the Severn Gorge,...

Harwich - Emergency Stabilisation Ground Anchors

Harwich – Emergency Stabilisation Ground Anchors

CAN was brought in to work alongside the piling contractor to carry out emergency stabilisation works to a failing railway embankment,...

Dudley - Design and Build slope stabilisation solution

Dudley – Design and Build slope stabilisation solution

Redevelopment of a brownfield site into a large industrial estate required a design and build slope stabilisation solution.  This allowed excavation...

Hagg Bank - Retaining Wall Construction & Landslip Remediation Solution

Hagg Bank – Retaining Wall Construction & Landslip Remediation Solution

CAN completed an essential landslip remediation on the approach road to a village cut into heavily wooded sidelong ground,carrying out a...

Loch Lomond – Ground Investigation

Loch Lomond – Ground Investigation

Proposals to carry out the re-alignment of a highway through a rock promontory required detailed ground investigation of the ground conditions...