
Rosebury House – High Rise Building Inspection
- 18/02/2016 /
- Case Studies
CAN was appointed to undertake the inspection and close examination of the external elevations of a commercial high rise building for defects,...

Eliot & Wentworth Court – Inspection and Repair
- 11/02/2016 /
- Case Studies
Following extensive water ingress issues to a recently built residential block CAN was asked to undertake an inspection of facia cladding...

Millennium Footbridge – Redecoration works
- 19/10/2015 /
- Case Studies
CAN was requested to undertake the painting of the Millennium Footbridge, central London. The client stipulated that the bridge had to...

Greater London House – Redecorations
- 17/07/2015 /
- Access
CAN was approached to look at means of carrying out re-decoration of the facades of the building. This former Carreras cigarette factory...

Hungerford Bridge – Cast Iron Pier Repairs
- 17/06/2015 /
- Access
Having identified that stitch repairs were required to the cast iron piers to Hungerford Bridge, Network Rail required the development of...

Hagley Railway Cutting – Rock Face Stabilisation
- 22/02/2015 /
- Case Studies
The rock face of this narrow rail cutting required extensive stabilisation including de-vegetation, scaling and strengthening works to be carried out. The face...

Boston Boatyard Development – Quarry Face Stabilisation
- 17/10/2014 /
- Case Studies
With the walls of this old quarry forming the backdrop to what will be the back gardens of a new housing...

Lyme Regis – Coastal Slope Stabilisation
- 17/09/2014 /
- Case Studies
The project asked for the coastal slope stabilisation of a 900m long slope below which a new sea wall was being...

Jersey – Rock Anchoring and Cliff Stabilisation
- 17/03/2014 /
- Case Studies
CAN acted as Principal Contractor on this major project to stabilise an old quarry prior to redevelopment and the adjacent unstable cliffs...

West Cornforth – Rock Bolting & Tecco Netting Installation
- 17/07/2013 /
- Case Studies
Fracturing of the rock faces at either side of the A1(M) cutting in West Cornforth required remediation to safeguard the adjacent...