
Corby Bridge (Wetheral Viaduct) Refurbishment of Pedestrian Walkway
- 20/02/2023 /
- Access
CAN were appointed to undertake the refurbishment of a high level pedestrian walkway (dating from 1851) over the River Eden in...

Illuminated River Project – Phase 1 Installation of Architectural Lighting
- 15/11/2019 /
- Case Studies
In 2019, as part of Phase 1 of the Illuminated River Project, CAN was asked to assist with the removal of...

160 Great Portland Street – Confined Space Works
- 09/07/2019 /
- Case Studies
CAN was appointed to remove redundant services and demolition debris from a large inaccessible void as part of a multi-million-pound office...

Waterloo Bridge – Pier Head Access Upgrade Works
- 31/07/2018 /
- Access
As part of a refurbishment project to improve the access routes onto the pier heads CAN was asked to install...

Turners Road Penstock Chambers – Deck replacement
- 18/01/2018 /
- Case Studies
Routine inspections identified that the beams supporting the landings to the Turners Road Penstock chambers had suffered such a large loss...

Wimbledon Centre Court – Lighting Installation
- 29/11/2017 /
- Case Studies
CAN was requested to undertake the replacement of the lighting system to Centre Court, Wimbledon. As with all stadia projects, it...

Natural History Museum – Installation of the Blue Whale Skeleton
- 23/10/2017 /
- Case Studies
CAN undertook an initial inspection and dimensional survey of roof trusses to Hintze Hall of the Natural History Museum, for...

HMS Belfast – Halliard Replacement Project
- 11/10/2017 /
- Case Studies
The Imperial War Museum wanted to be able to ‘dress’ HMS Belfast on important occasions and asked CAN to carry out...

Cheesegrater Car Park – Rope Access Cladding Repairs
- 03/08/2017 /
- Case Studies
With it’s distinctive cladding, the aptly dubbed ‘Cheesegrater’ car park in Sheffield, was suffering from problems with the cover trims to...

The Gate – Chandelier Lighting Installation
- 13/07/2017 /
- Case Studies
CAN was requested to install a new 4 tonne, 8m wide, 10m high light installation to the Gate as part...