Blog Header

Access

Case Studies

Corby Bridge (Wetheral Viaduct) Refurbishment of Pedestrian Walkway

CAN were appointed to undertake the refurbishment of a high level pedestrian walkway (dating from 1851) over the River Eden in...

Dover Docks – Pier F Installation of Mooring Equipment

CAN were contracted to assist with the installation of mooring equipment to Pier F, Port of Dover, particularly to access the...

King George V - Flood Barrier

King George V Floodgate – Confined Space Rescue Team

The Environment Agency inspects all flood defences in London and the Thames estuary at least annually and in most cases...

Waterloo Bridge - Pier Head Access Upgrade Works

Waterloo Bridge – Pier Head Access Upgrade Works

As part of a refurbishment project to improve the access routes onto the pier heads CAN was asked to install...

Manchester United Old Trafford Football Stadium - cladding & steelwork repairs

Old Trafford Football Stadium – Cladding & Steelwork Repairs

Corrosion had led to concerns about the integrity of the brackets that secure the canopy cladding panels to the South Stand...

ArcelorMittal Orbit Tower – Installation of tube slide

The 114m high ArcelorMittal Orbit Tower is one of London’s newest iconic structures. The concept of building the world’s longest...

CAN trials new cornice access system

Greater London House – Redecorations

CAN was approached to look at means of carrying out re-decoration of the facades of the building.  This former Carreras cigarette factory...

Hungerford Bridge bespoke access provision

Hungerford Bridge – Cast Iron Pier Repairs

Having identified that stitch repairs were required to the cast iron piers to Hungerford Bridge, Network Rail required the development of...