Riverside Stand – Fulham FC Soffit Cladding Installation
- 28/03/2023 /
- Access
To overcome program restrictions Buckingham Group asked CAN to design a bespoke access methodology for works to the soffit of the...

Northpoint – ACM Cladding Removal
- 27/03/2023 /
- Access
Northpoint residents were being charged for an ongoing fire watch service because of the combustible nature of the cladding material installed...

Somerton House – Window Replacement
- 23/03/2023 /
- Access
CAN was requested to assist with the window replacement scheme to Somerton House and particularly to provide access to and encapsulation...

QE2 Bridge Cable Stay Recoating
- 27/02/2023 /
- Access
The Queen Elizabeth II Bridge is on the M25 at Dartford. The cables on the bridge are up to 220m long...

Corby Bridge (Wetheral Viaduct) Refurbishment of Pedestrian Walkway
- 20/02/2023 /
- Access
CAN were appointed to undertake the refurbishment of a high level pedestrian walkway (dating from 1851) over the River Eden in...

Dover Docks – Pier F Installation of Mooring Equipment
- 09/02/2023 /
- Access
CAN were contracted to assist with the installation of mooring equipment to Pier F, Port of Dover, particularly to access the...

King George V Floodgate – Confined Space Rescue Team
- 09/07/2019 /
- Access
The Environment Agency inspects all flood defences in London and the Thames estuary at least annually and in most cases...

Waterloo Bridge – Pier Head Access Upgrade Works
- 31/07/2018 /
- Access
As part of a refurbishment project to improve the access routes onto the pier heads CAN was asked to install...

Old Trafford Football Stadium – Cladding & Steelwork Repairs
- 18/01/2018 /
- Access
Corrosion had led to concerns about the integrity of the brackets that secure the canopy cladding panels to the South Stand...

ArcelorMittal Orbit Tower – Installation of tube slide
- 03/01/2017 /
- Access
The 114m high ArcelorMittal Orbit Tower is one of London’s newest iconic structures. The concept of building the world’s longest...