Case Studies

Millennium Footbridge Coating

Millennium Footbridge – Redecoration

CAN was requested to undertake the painting of the Millennium Footbridge, central London. The client stipulated that the bridge had to...

Winterbourne Viaduct

Winterbourne Viaduct – Tie Bar Installation

CAN was contracted to carry out the installation of heavy-duty brackets, secured with Cintec anchors installed in cored holes, to support...

Speaker Array

Speaker Array Installation– Tottenham Hotspur Stadium

In 2018 CAN were requested to undertake the installation of 18 speaker array systems to the prestigious new Tottenham Hotspur Stadium....

Houses of Parliament

Confined Spaces Inspection of Riser Shaft – Houses of Parliament

The Parliamentary Works Department requested CAN Structures to investigate a water ingress problem to a riser shaft in the Houses of...

Bridge Cable Stay Recoating

Bridge Cable Stay Recoating – Queen Elizabeth II Bridge

CAN was requested to undertake bridge cable stay recoating of the Queen Elizabeth II bridge on the M25 at Dartford, Kent....

Glasgow High Rise Blocks – Multi Storey Flats Repairs

CAN Structures Ltd was awarded a 3-year contract to undertake façade inspections on 136no. high rise structures across Glasgow. Repair programmes...

Silchester Estate Tower Blocks – Inspection & Safety Survey

CAN Structures Limited was instructed to undertake the inspection and safety surveys of 4 tower blocks on the Silchester Estate, London....

Tower Bridge – Roof Inspection

In 2011 and again in 2016, CAN was requested to undertake an inspection of the roofs to the abutments and towers...

Villers Bretonneux – General Maintenance

Opening in 1938, Villers Bretonneux is the main memorial in France to Australian military personnel killed on the Western Front during...

Edward Woods Estate – Securing of Tower Block Gable Ends

CAN undertook the installation of Helifix Dry Fix (retro fit wall ties) and metal straps to the gable ends of three...