No.1 London Bridge – Soffit Inspection and Repair

No.1 London Bridge – Soffit Inspection and Repair
Back to Case Studies

Supporting Broadgate Estates for 2 weeks in Central London

CAN carried out the urgent inspection and repair of soffit cladding on an iconic building in central London after defects were identified above a pedestrian area. The works made the structure safe and enabled permanent remedial repairs to be completed.

The inspection and repair of the cladding system to the soffit of an iconic building in central London following the failure of a section located above an area of public access. As a result there was an urgent requirement for the inspection of the cladding system and the removal of any potentially dangerous cladding sections and repair of those sections.

As the building geometry and ground level conditions were not suitable for the use of a suitably sized MEWP, CAN access teams employed a 15m length of CAN-Span (a lightweight modular work positioning platform) rigged from roof level.

After an initial inspection, the CAN team identified a number of components that needed to be removed for safety reasons. Having made the structure safe, CAN installed remedial fixings to the soffit cladding panels.

All remedial works were independently inspected and approved upon completion, again utilising CAN-Span for access.