Blog Header

By: Emma Milton

Shute Shelve Tunnel - Rock bolting

Shute Shelve Tunnel – De-vegetation & Rock Bolting

Shute shelve tunnel is an old disused railway tunnel is now used exclusively by pedestrians and cyclists.  Areas of unstable...

Buckland Hollow A610 - soil nailing

Buckland Hollow A610 – Soil Nailing & Facing

The slope in question is sandwiched between the A610 and the River Amber.  Over the years erosion has lead to...

Wimbledon Centre Court - lighting installation

Wimbledon Centre Court – Lighting Installation

CAN was requested to undertake the replacement of the lighting system to Centre Court, Wimbledon. As with all stadia projects, it...

Mental Health at CAN: First Aiders Tim Nixon and Hazel Farnell

CAN improves commitment to mental health & well-being

CAN is continuing to improve our commitment to health and well-being. Hazel Farnell has recently undertaken a NEBOSH qualification in...

Watford Tunnel – De-vegetation & Rockfall Netting

Back in late 2016, CAN worked to remove approximately 15,000m2 of vegetation and install passive/drape mesh (Maccaferri 13,950m2, Enkamat 5,850m2)...

Rhyl Bridge (Pont-y-Ddraig) - Minor Bridge Maintenance. Getting to the underside of the bridge deck.

Rhyl Bridge (Pont-y-Ddraig) – Minor Bridge Maintenance

Ongoing general maintenance was required to the bridge, consisting of the installation of new electrical feed cables to the under-bridge lights...

Hinckley Point C Piers – Structural Inspection & Testing

As part of the new Hinckley Point C Power Station works, Costain asked CAN to assist in gaining access to the...

Natural History Museum - Rigging the Blue Whale Skeleton. Hope starts the journey up into the roof!

Natural History Museum – Rigging the Blue Whale Skeleton

Following CAN Structure’s initial inspection and site survey of the roof trusses in the Hintze Hall of the Natural History Museum back in...

Marple Cutting - De-vegetation & railway rockfall netting. The completed works

Marple Cutting – De-vegetation & Railway Rockfall Netting

CAN was employed to complete the de-vegetation of a 1km long section of railway cutting at Marple, Stockport, in order...

Radstock - Slope Stabilisation & Soil Nailing. Topsoil being added to the slope

Radstock – Slope Stabilisation & Soil Nailing

This project consisted of the stabilisation of a newly cut 180 lin m soil slope with the installation of 350...