Blog Header

By: Emma Milton

Soil Nails, rockfall netting, erosion matting, excavating, earthworks, temporary works, drilling, slope stabilisation

CAN ‘Heads’ up one heck of a job on the A465

The A465, or Heads of the Valleys road, is one of The Welsh Government’s key strategic corridors and an international gateway...

CAN IS RECRUITING ROPE ACCESS TECHNICIANS LONDON

Rope Access Technicians – London

CAN Vacancy – Rope Access Technicians (London area). Hold an IRATA Level 1 or 2 ticket?  Based in the London area?...

Rope Access Technicians - Geotechnical

Rope Access Technicians – Geotechnical

CAN Vacancy – Geotechnical Rope Access Technicians Are you an experienced IRATA Level 1 or 2?  Do you have onshore geotechnical site...

Filton Abbey Wood - Retaining Wall Construction

Filton Abbey Wood – Retaining Wall Construction

The overall scheme was to increase the number of lines into Bristol, from two to four.  The works consisted of lots...

CAN IS RECRUITING A PLANT FITTER

Plant Fitter

CAN Vacancy – Plant Fitter. We have an opportunity available for a qualified Plant Fitter based at our Chesterfield depot (S41...

Soil nailing & gabion installation - Heads of the Valleys

Heads of the Valleys Road – Soil Nailing & Facing Main Works

The A465, or Heads of the Valleys road, is one of The Welsh Government’s key strategic corridors and an international gateway...

Drone / UAV Inspection

Drone / UAV Inspection

Using the latest in drone / UAV technology and with a background in structural inspection, CAN is able to deliver a...

CAN Railways Brochure

CAN Railways Brochure

Whilst we hope our website offers all the information you’re looking for, perhaps you’d prefer to see our CAN Railways capabilities...

Woodlands Avenue mudslide - slope stabilisation

Woodlands Avenue Mudslide – Slope Stabilisation

During a period of prolonged stormy weather, the mainline railway between Exeter to Dawlish was completely closed as a result...

Ashley Hill South Embankment - earthworks projects

Ashley Hill South Embankment – Earthworks Projects

The Filton Bank 4 Track project increases the number of tracks from 2 to 4 between Dr Days and Filton...