Blog Header

By: alex.ryan@can.ltd.uk

Thames Court River Wall- Pointing Repairs

CAN was instructed by CBRE to conduct repairs to the Thames Court river wall in Central London. The project consisted of...

Arthur Wait Stand, Crystal Palace FC – Laser Display Screen

CAN was contracted to remove the advertisement banners and vertical facias, renovate existing steelwork and install laser display screens across the...

Blackfriars Railway Bridge – Inspection

CAN was requested to undertake an inspection of the Blackfriars Railway Bridge. Site constraints included working over water and on the...

Wheatley Group – Net Installation

Following the failure of the render to the elevations of two high rise blocks, Wheatly Group requested CAN Structures Ltd design...

Golden Jubilee Access

Golden Jubilee Footbridge – Principle Inspection

CAN was requested to undertake a principle inspection to the iconic Golden Jubilee Footbridges in London. The inspections included all cables,...

Salt Quay House – Net Installation

CAN Structures Ltd was requested to design and install an encapsulation system to protect pedestrians from failed limestone facia panels to...

Millennium Footbridge Coating

Millennium Footbridge – Redecoration

CAN was requested to undertake the painting of the Millennium Footbridge, central London. The client stipulated that the bridge had to...

Winterbourne Viaduct

Winterbourne Viaduct – Tie Bar Installation

CAN was contracted to carry out the installation of heavy-duty brackets, secured with Cintec anchors installed in cored holes, to support...

Speaker Array

Speaker Array Installation– Tottenham Hotspur Stadium

In 2018 CAN were requested to undertake the installation of 18 speaker array systems to the prestigious new Tottenham Hotspur Stadium....

Houses of Parliament

Confined Spaces Inspection of Riser Shaft – Houses of Parliament

The Parliamentary Works Department requested CAN Structures to investigate a water ingress problem to a riser shaft in the Houses of...