Blog Header

Resources

The blog subtitle

2016

CAN completes installation of world’s tallest and longest tunnel slide, spiralling down a vertical drop of almost 80m from the viewing...

High Level Rigging - Orbit Tower Slide - London

High Level Rigging on the London Olympic Park Orbit Tower Slide

CAN completes a high profile, high level rigging project on the World’s longest tube slide. The tallest and longest slide in...

Royal Border Bridge - Lighting Installation

Royal Border Bridge Lighting Installation

Floodlights needed installing to illuminate this iconic 28-arch bridge to mark the 160th year of its opening.  This comprised fitting of...

Tie bars and ground anchors installation

Ground Anchors

Whether it is working within a confined excavation to install tie back anchors supporting sheet piles or an exposed seawall accessed...

Trawsfynydd Power Station structural repair

Trawsfynydd Power Station – Reactor Hall Repairs

As part of the decommissioning programme of this now offline 1950s nuclear power station the external fabric of the structure required...

Rockfall netting and meshing

Rockfall Netting & Meshing

Rockfall netting may be installed on cliff faces that are subject to ongoing rockfalls as a continuous, passive free-hanging ‘curtain’.  Passive rock...

Samphire Hoe catch fencing installation

Catch Fences

Catch fences or rockfall barriers are installed as a measure to contain falling rock.  The location and height of fence will be...

Retaining walls installation

Retaining Walls

If existing retaining walls are failing, we may be required to install double corrosion protected ground anchors.  For this reason, these...

Tie Bars installation

Tie Bars

Tie bars are often chosen to strengthen spandrel walls on listed structures including masonry bridges and viaducts.  CAN will take all...

Sealant installation

Sealant

CAN will inspect, repair or replace sealant across a multitude of structure types.  Working closely with quality industrial suppliers, we are...