Loch Lomond – Ground Investigation

Proposals to carry out the re-alignment of a highway through a rock promontory required detailed investigation of the ground conditions on...

2005

CAN designs and installs high capacity anchors within the basements of the new Wembley Stadium to support the arch steelwork during...

2003

CAN re-locates the London base to larger offices and warehouse in Northfleet, enabling us to hold the full range of plant...

2001

One of several cleans undertaken by CAN to the clock faces on the Palace of Westminster, aka Big Ben. This image...

CAN at the London Eye

2000

CAN opens a Kent office to serve the Greater London area.

1999

In Gibraltar, an 80m high limestone cliff is stabilised by CAN, to make safe a key recreational area. Work included installation...

1999

CAN installs cable net and fabric roof to the Millennium Dome, the largest membrane structure in the world. Despite the political...

1997

CAN completes design and build stabilisation scheme at Pylle Hill in Bristol, acting as Principal Contractor to Railtrack. Works include site...

1996

Secondary damper cables are installed by CAN on the newly constructed Second Severn Crossing, to reduce unwanted oscillations in the main...

1991

CAN develops a remotely controlled access platform which is used to apply Metalcoat to the stay cables on the new Dartford...