Blog Header

Resources

The blog subtitle

Rock Bolting & Tecco Netting Installation

Fracturing of the rock faces at either side of the A1(M) cutting in West Cornforth required remediation to safeguard the adjacent...

Beaminster Tunnel Stabilisation

Soil slipped from an unstable slope above Beaminster tunnel portal in July 2012, tragically killing two people. The client was under...

Coldrenick Viaduct – Pier Strengthening

The project required the removal of 38 defective existing steel collars, comprising heavy section steel channels and tie bars. As each...

Milverton Railway Viaduct – Masonry Repairs

CAN was invited to carry out repairs to a masonry railway viaduct running over a watercourse. The works required consisted of; inspection,...

Flintshire Bridge – Principal Bridge Inspection

The project required the undertaking of a principal inspection of Flintshire Bridge, a 1km long 20-span cable-stayed road bridge, including a...

Bridge inspection

2012

Following successful prototype testing, CAN pilots its new CANBeam to provide soffit access over a 32m clear span during the Principal...

CAN certification

2012

CAN successfully registers for ISO 9001, ISO 14001 and OHSAS 18001 through UKAS Accredited Certification body.

High Level Deluge System Installation, Energy from Waste, Ardley

Scaffolding above the 50m high waste collection pit not being possible CAN was brought in to assist the client in getting...

Rock Anchoring in New Highway Cuttings, Glandyfi

The stabilisation of two new highway cuttings as part of a substantial trunk road widening scheme. The Glandyfi site is restricted on...

Bridge Vally Road Slope Stabilisation

Bridge Valley Road Stabilisation

Bridge Valley Road forms an important commuter link between Clifton and Bristol centre, situated on the side of the Severn Gorge,...