Blog Header

History

2016

CAN completes installation of world’s tallest and longest tunnel slide, spiralling down a vertical drop of almost 80m from the viewing...

2015

CAN opens a new office in Bristol to provide greater support for ongoing contracts within the South West of England and...

2014

Winter storms cause the catastrophic failure of the seawall and adjacent seacliff at Dawlish resulting in the closure of the main...

2013

CAN acts as Principal Contractor for the design and build stabilisation of Westmount Quarry and Park Heights, in Jersey. The £6m+...

Bridge inspection

2012

Following successful prototype testing, CAN pilots its new CANBeam to provide soffit access over a 32m clear span during the Principal...

CAN certification

2012

CAN successfully registers for ISO 9001, ISO 14001 and OHSAS 18001 through UKAS Accredited Certification body.

2011

Bridge Valley Road, a vital commuter link within Bristol is stabilised by CAN for the City Council within a SSSI and...

2005

CAN designs and installs high capacity anchors within the basements of the new Wembley Stadium to support the arch steelwork during...

2003

CAN re-locates the London base to larger offices and warehouse in Northfleet, enabling us to hold the full range of plant...

2001

One of several cleans undertaken by CAN to the clock faces on the Palace of Westminster, aka Big Ben. This image...