Construction Services

Case Studies

Work at Height

Rope Access Cladding Repairs Cheesegrater Car Park

With it’s distinctive cladding, the aptly dubbed ‘Cheesegrater’ car park in Sheffield, was suffering from problems with the cover trims to...

Lords Cricket Ground – Fabric Roof Installation

The new Warner Stand’s innovative design includes a semi-translucent fabric roof supported by a steel and timber structure, which is the...

Brook Green – Sealant Installation

The Brook Green project involved complete refurbishment of an old car showroom and conversion into office space with the addition of...

American Embassy – Installation of Architectural Brise Soleil

CAN were commissioned to install a complex architectural brise soleil to 3 of the 4 facades of the iconic new American...

ArcelorMittal – Orbit Tower Slide

The 114m high ArcelorMittal Orbit Tower is one of London’s newest iconic structures. The concept of building the world’s longest...

Royal Border Bridge - Lighting Installation

Royal Border Bridge Lighting Installation

Floodlights needed installing to illuminate this iconic 28-arch bridge to mark the 160th year of its opening. This comprised fitting of...

Emirates Stadium LED lighting installation

Emirates Stadium LED lighting installation

CAN was employed to carry out the installation of new LED lighting throughout the stadium, which comprised 112 units to the roof...

High Level Deluge System Installation, Energy from Waste, Ardley

Scaffolding above the 50m high waste collection pit not being possible CAN was brought in to assist the client in getting...