Case Studies

Risehill Tunnel shaft works

Risehill Tunnel Shaft Works

Located on open exposed moorland on the edge of the Yorkshire Dales, this was for CAN Structures a remote project. ...

Rock bolting at Shute Shelve Tunnel

De-vegetation & Rock Bolting – Shute Shelve Tunnel

Shute shelve tunnel is an old disused railway tunnel is now used exclusively by pedestrians and cyclists.  Areas of unstable...

Soil Nailing & Facing – Buckland Hollow A610

The slope in question is sandwiched between the A610 and the River Amber.  Over the years erosion has lead to...

Lighting Installation Wimbledon Centre Court

Lighting Installation – Wimbledon Centre Court

CAN was requested to undertake the replacement of the lighting system to Centre Court, Wimbledon. As with all stadia projects, it...

De-vegetation & Rockfall Netting – Watford Tunnel

Back in late 2016, CAN worked to remove approximately 15,000m2 of vegetation and install passive/drape mesh (Maccaferri 13,950m2, Enkamat 5,850m2)...

Minor Bridge Maintenance – Rhyl Bridge (Pont-y-Ddraig)

Ongoing general maintenance was required to the bridge, consisting of the installation of new electrical feed cables to the under-bridge lights...

Structural Inspection & Testing – Hinckley Point C Piers

As part of the new Hinckley Point C Power Station works, Costain asked CAN to assist in gaining access to the...

Rigging the Blue Whale Skeleton – Natural History Museum

Following CAN Structure’s initial inspection and site survey of the roof trusses in the Hintze Hall of the Natural History Museum back in...

de-vegetation-rockfall-netting-marple

De-vegetation & Railway Rockfall Netting – Marple Cutting

CAN was employed to complete the de-vegetation of a 1km long section of railway cutting at Marple, Stockport, in order...

Slope Stabilisation & Soil Nailing – Radstock

This project consisted of the stabilisation of a newly cut 180 lin m soil slope with the installation of 350...